Set in the forms
Wood forms set the edges and the slope, so the finished slab drains away from the house and lines up with the garage.
Concrete driveways
Free written quotes on concrete driveways in Greenwood, MS.
New installs and replacements, finished clean. Built for 30+ years.
We pour concrete driveways across Greenwood and Leflore County, including North Greenwood and the Boulevard area, with crews from our Madison and Jackson locations.
| typical thickness | Spec'd per job |
|---|---|
| base material | Compacted aggregate base |
| cure time | Walk on in 24 hours, drive on in 7 days, full cure 28 days |
Concrete driveways are poured by our own employees, not a sub, and a good one comes down to what goes in before the truck shows up. The ground is dug out and a compacted base is built under the whole footprint. Forms are set to the grade so water runs away from the house and the garage, and rebar goes in to tie the slab together.
Thickness is spec'd for what you park on it. A drive that only sees the family cars is different from one where a work truck or a boat trailer sits every night, so we ask at the estimate and build the slab for that.
After the pour, the crew gives the surface a clean broom finish for grip and cuts control joints, so the slab has a planned line to crack along instead of cracking at random. Concrete costs more up front than asphalt, and it lasts 30 years or more.
Wood forms set the edges and the slope, so the finished slab drains away from the house and lines up with the garage.
Concrete driveways
Our finishers work the surface while it is fresh and leave a clean broom finish that gives tires and shoes some grip.
Concrete work
Control joints give the slab a straight line to crack along, so shrinkage shows up there instead of across the middle of the drive.
Paving in GreenwoodA concrete driveway takes longer to hand back than asphalt, so it helps to plan the household around it. You can walk on it after 24 hours. Cars wait about 7 days. The slab reaches full cure at 28 days, so save anything heavy for after that.
For a family, that first week matters. Kids heading to the bus walk around the edge for the first day, then they can cross it. The cars park on the street or in a neighbor's drive. If someone needs the car early every morning, pick a pour date for a stretch when street parking is easy, and we plan the job around it.
Concrete or asphalt is a fair question. Asphalt usually costs less up front, and cars can drive on it after about 24 hours. Concrete costs more up front and takes longer before you can park on it, but it lasts 30 years or more. We do both with our own crews, so we can put both on one quote.
Once the base, the forms, and the rebar are ready, the truck pumps concrete into the forms and the crew spreads it while it is workable.
Get a concrete quote
Where the drive meets the garage, the finisher floats the fresh concrete so the slab lines up with the garage opening.
More on concrete drives
An extra concrete pad gives a second car or a trailer its own spot, so the main drive stays clear on school mornings.
Or pave it in asphaltWe do not give concrete prices over the phone. The number depends on the size, the tear-out, the base work, and how thick the slab needs to be for what you park on it, so someone comes out by appointment to measure and look.
The free written quote often comes the same day. It has a line item for each service, each with its own scope, so removing an old drive, building the base, and pouring the new slab each show up on their own. If you want an asphalt price for the same driveway, ask, and we will add it.
After you approve it and pay the deposit, most jobs are scheduled within 2 to 3 weeks. Remember the 7 days before cars can park on it when you pick the date, and give us any days the drive has to be clear.
A visit by appointment to measure the drive, check the grade, and ask what will park on it.
Free, often the same day, with tear-out, base, and pour on their own line items.
Walk on it after 24 hours, drive on it after about 7 days, and full cure comes at 28 days.
PavePro does, with our own employees. We pour concrete driveways across Greenwood and Leflore County from our Madison and Jackson locations.
After 24 hours. Before that, keep everyone off it, including pets and bikes.
Cars can drive on it after about 7 days. Full cure takes 28 days.
Yes. Rebar goes in over a compacted base before the pour.
Those are control joints. They give the slab a planned line to crack along as it shrinks, so cracks follow the joint instead of running across the drive.
A clean broom finish, which gives tires and shoes grip.
Yes. We do both in-house, so we can quote both. Asphalt usually costs less up front, and concrete costs more.
It depends on how you will use it. We spec the thickness and rebar per job, and heavier vehicles like trucks or RVs get a thicker pour.
A properly installed concrete driveway in Mississippi lasts 30+ years with very little maintenance.
Yes. We break out the old concrete or asphalt, haul it away, and regrade before we pour the new driveway.
Tell us about the job and we'll send a written quote with a line item for each service.