Church steeple and brick sanctuary beside a newly striped parking lot, aerial view. PavePro, asphalt paving contractor serving Laurel, MS.

Asphalt Paving Company in Laurel MS

Free written quotes for driveways, parking lots, sealcoating, and striping in Laurel, MS.

Asphalt paving services in Laurel, MS

Asphalt paving in Laurel, MS, planned around your calendar

PavePro paves with our own crews. We never sub out paving, and the striping, ADA markings, and concrete work are done in-house by our own employees. One company lays the asphalt, paints the lines, and answers for both, so nothing falls between two contractors when a date matters.

In Laurel and across Jones County, we pave church parking lots, home driveways, and business lots, and we keep them working with crack filling, sealcoating, and restriping. We work in Downtown Laurel, Queensburg, West Laurel, North Laurel, and the roads in between. Much of that work is for congregations, so we ask about the calendar before we ask about square footage: Sunday services, Wednesday nights, weddings, revivals, and the funerals nobody can plan for.

Every job is done by appointment at your property. We walk the site with whoever holds the keys and the calendar, then write a free quote. Call at any hour or request one online.

Restriped parking rows beside a brick church building. PavePro, asphalt paving contractor serving Laurel, MS.

Church parking lot paving in Laurel, between one Sunday and the next

A church lot has an unusual week. It sits mostly empty from Monday to Saturday, then fills in a single hour, with every car arriving and leaving at once. That gives a crew a clean window to work in, as long as the job is planned around it.

Paving usually takes 1 to 2 days, and cars can park on new asphalt after about 24 hours, so a lot paved early in the week is usually ready well before Sunday. A bigger lot, or one getting sealcoating and striping too, runs 2 to 5 days. We split it into sections so the office, the fellowship hall, or a weekday ministry still has parking while the crew works. Thickness is spec'd per job after we see the site, and drive lanes that carry vans and buses can be built heavier than the parking rows.

Before we set dates, we ask what is on the church calendar for the next month. A wedding on Saturday or a revival that starts Sunday night changes the order we pave in, and we would rather hear it at the walk-through than find out from the parking lot.

Aerial view of a church parking lot being paved with a roller and loader. PavePro, asphalt paving contractor serving Laurel, MS.
Fresh asphalt parking lot at a brick church. PavePro, asphalt paving contractor serving Laurel, MS.

Built for Sunday traffic

Entrances and drive lanes take every car at once on Sunday morning, so we look hardest at those areas before we write the quote.

Parking lots in Laurel
Crew walking beside the paver as it lays fresh asphalt. PavePro, asphalt paving contractor serving Laurel, MS.

Overlay or rebuild

A lot that is worn on top but sound underneath can take a new layer of asphalt. Failed areas get cut out and rebuilt first.

Resurfacing
Fresh asphalt lot with a skid steer finishing the edge. PavePro, asphalt paving contractor serving Laurel, MS.

Edges and entrances

Edges along curbs, walks, and the drop-off by the door are finished tight, so the new surface meets them cleanly with no lip to trip on.

Parking lot repair

Sealcoating and striping a Laurel church lot around weddings and funerals

Sealcoat and fresh lines are what most people notice when they pull into a church lot, and they are usually wanted before something: a wedding, a homecoming, a revival week. The work itself is short. The timing is the part that takes planning.

Cracks are cleaned out and filled with hot-applied crack filler, then two coats of sealcoat go on, flood-coated with a squeegee machine on a large lot. The coating needs 24 to 48 hours to dry before cars go back on it. Sealcoat covers the old lines, so our own crew restripes the stalls, ADA spaces, access aisles, and arrows once it dries. Commercial fast-dry paint is ready in about 30 minutes, and for some projects striping can be done at night or on a weekend.

Funerals are the one event nobody can put on a schedule. When we set dates, we agree with you on which entrance and which block of parking stay open if one comes up, so the church has a plan ready. On a large lot, sealing in sections is what makes that possible.

Aerial view of sealcoat going on a commercial lot one section at a time. PavePro, asphalt paving contractor serving Laurel, MS.
Ride-on sealcoater spraying a parking lot. PavePro, asphalt paving contractor serving Laurel, MS.

Two coats

Two coats of sealcoat on every job, every 1 to 2 years. A newly paved lot waits 6 to 12 months for its first coat.

Sealcoating in Laurel
Crew striping blue ADA stalls with a line striper. PavePro, asphalt paving contractor serving Laurel, MS.

Lines after the coat

Our own crew restripes once the sealcoat dries, ADA stalls included. Fast-dry paint is ready in about 30 minutes, and layout changes are fine.

Striping in Laurel
Fresh crack-fill lines across a parking lot surface. PavePro, asphalt paving contractor serving Laurel, MS.

Cracks filled first

Cracks are cleaned out and filled with hot-applied filler before any coating goes down, so water stops reaching the base underneath.

Crack filling

Driveway paving in Laurel for parsonages and church families

Not every job is a parking lot. We pave asphalt driveways and pour concrete driveways for homes across Laurel and Jones County, including parsonages that sit beside a church lot and need the same care.

An asphalt driveway goes down 3 inches laid and 2.5 inches compacted, over a compacted crushed limestone base. Cars can usually drive on it after about 24 hours. It cures over the next 6 to 12 months, so avoid turning the wheels in place while it does. With upkeep it can last 20 to 30 years, and it usually costs less up front than concrete.

Concrete costs more up front and can last 30 years or more. We pour it over a compacted base with rebar, cut control joints, and a clean broom finish, with the thickness spec'd for what you park on it. You can walk on it at 24 hours and drive on it at about 7 days, so if family is coming in for a wedding or a holiday, count back from that date before you choose.

Long new asphalt driveway leading up to a ranch house. PavePro, asphalt paving contractor serving Laurel, MS.

New asphalt driveways

A new driveway over a compacted crushed limestone base, rolled smooth, with cars back on it in about 24 hours.

Asphalt driveways in Laurel

Concrete driveways

Rebar, cut joints, and a broom finish. Drive on it at about 7 days, and it reaches full cure at 28 days.

Concrete driveways in Laurel

Tear out and replace

When an old driveway has failed down to the base, we tear it out and build it back instead of paving over the problem.

Driveway repair

How a Laurel parking lot paving quote reaches the committee

Church projects usually need more than one yes. A pastor, the trustees, or a building committee has to see the work and the cost before anything is scheduled, so we write quotes meant to be passed around a table.

There are no prices over the phone. For paving and concrete, we come out by appointment and walk the lot, then write the quote, often the same day. Sealcoating and striping can usually be quoted from photos. Every quote is free and written, with a line item for each service, each with its own scope, so the committee can approve the paving now and the sealcoat later if that is how the budget works.

Once the quote is approved and the deposit is in, most jobs are scheduled within 2 to 3 weeks. Urgent repairs can go sooner, sometimes within 10 days. We set the work days around your services and events, and confirm them with the person who keeps the church calendar.

Church steeple over fresh asphalt and blue ADA striping, aerial view. PavePro, asphalt paving contractor serving Laurel, MS.

Three steps to a date on the calendar

  1. 1

    Walk the lot

    We meet you at the church by appointment, look at the pavement, and ask what is on the calendar for the coming weeks.

  2. 2

    Written quote

    A free quote with a line item and scope for each service, ready to share with the committee, often the same day.

  3. 3

    Set the dates

    After the deposit, we pick work days that stay clear of services, weddings, and the other events on your calendar.

How a paving job works

Paving in Laurel and nearby towns

PavePro runs crews through Laurel and the rest of Jones County. We pave and seal from Laurel Central Historic District and Downtown Laurel to Queensburg and West Laurel.

Every job gets a free written quote.

Recent paving work

Reviews from PavePro customers

Google review
★★★★★

"Patrick with PavePro is great to work with. Very reasonable pricing. Did fantastic job seal coating and striping our church parking lot. Would definitely recommend to anyone!"

Taylor Crysel, Mississippi
Google review
★★★★★

"PavePro has been a total Godsend for me. I'm the facilities manager over all our properties at a property management company here in Jackson, MS. I can just jump on their website, fill out the quick form, or even text their number with the address and I get a quote back fast. Works great for our managed properties, but they've also given me free estimates on places we're not even managing yet just so I can put repair numbers in an offer when we're trying to buy something. That flexibility has saved me a ton of headaches. No runaround, no 'we only quote our customers' nonsense. They just help.Highly recommend them if you're in Jackson or the surrounding area and need paving or asphalt work."

Shannon H, Jackson, MS
Google review
★★★★★

"Amazing to work with Patrick Wallace at PavePro. I would recommend to anyone needing help with paving, seal coating, or parking lot striping. He makes all projects seamless, and work is the highest quality."

Jeanne Burns, Mississippi

Laurel paving questions

Who paves church parking lots in Laurel, MS?
+

PavePro does, with our own crews. We pave, sealcoat, and stripe church lots in Laurel and across Jones County, and we never sub out the paving.

Can you pave our lot without missing a Sunday service?
+

Usually, yes. Paving takes 1 to 2 days on average and cars can park on new asphalt after about 24 hours, so we plan the work for the days the lot sits empty.

What happens if there is a funeral while you are working?
+

We plan for it before we start. On larger lots we work in sections and agree ahead of time which entrance and parking stay open if a funeral comes up.

How close to a wedding can you sealcoat and restripe?
+

Sealcoat needs 24 to 48 hours to dry, and fast-dry striping paint is ready in about 30 minutes. We set the dates with that drying time and your event in mind.

Can you stripe the lot at night or on a weekend?
+

For some projects, yes. Our own crew lays out and paints the stalls, ADA spaces, arrows, and fire lanes.

Who paves driveways in Laurel, MS?
+

We do. Our crews pave asphalt driveways and pour concrete driveways for homes and parsonages in Laurel and across Jones County.

Can our building committee get the quote in writing?
+

Yes. Every quote is free and written, with a line item for each service, each with its own scope. We don't give prices over the phone.

Where is PavePro located?
+

Our locations are in Madison and Jackson, and our crews come to you. Every job is done by appointment at your property, and quotes are free.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote