Turnaround at the shop
A wider section near the shop door gives a truck and trailer room to turn, so nobody has to back down the full length of the drive.
How we pave driveways
Free written quotes on asphalt driveways in McComb, MS.
New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.
We pave driveways in McComb and across Pike County, from Edgewood to Fernwood, with crews coming from our Madison and Jackson locations.
| typical thickness | 3 inches laid, 2.5 inches compacted |
|---|---|
| base material | Compacted crushed limestone |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
Plenty of driveways do more than get a car to the garage. They carry a pickup with a trailer, a load of parts, or a machine headed to the shop out back. We pave those driveways the way we pave a yard: figure out what drives on each part, then build for it.
Every driveway starts with the ground. Soft spots are dug out and rebuilt, a compacted crushed limestone base goes down, and the grade is shaped so water runs off the edges instead of sitting on the lane. The asphalt is laid 3 inches thick and rolled to 2.5 inches compacted.
Where the drive reaches the shop, we can widen it into a turnaround or a pad so a truck and trailer can swing around without cutting across the yard. Tell us what you pull and where it parks, and the layout follows from that. If the shop sees deliveries, mention that too. A box truck backing up to the door puts its weight on a different path than your own pickup does, and the base gets built for whichever one is heaviest.
A wider section near the shop door gives a truck and trailer room to turn, so nobody has to back down the full length of the drive.
How we pave driveways
A paved pad beside the drive keeps the trailer or work truck off the lane, and off the grass when the ground is soft.
Concrete pads in McComb
A long drive from the road gets the same base, thickness, and edge line the whole way, from the street apron to the house and the shop.
Private lane pavingOn a driveway that serves a shop, the weight lands in a few spots: the apron at the street where trucks turn in, the bend toward the shop, and the place a trailer sits. Those spots get the most attention in the base work, because a heavy wheel on a soft spot is where ruts start.
Rolling matters as much as thickness. Our crews compact the mat while it is hot and tamp the edges down with plate compactors, so the sides hold their shape instead of crumbling under a tire that drifts off the lane. Where the drive meets the street, the shop slab, or a carport, we pave a clean, even transition so a trailer does not bounce over a lip every trip.
After paving, cars can use it in about 24 hours, and heavy trucks after 48 to 72 hours. The asphalt keeps curing for 6 to 12 months. During that time, avoid turning your wheels while the truck is sitting still, and set trailer jacks on a wide board instead of bare asphalt. With upkeep, the driveway lasts 20 to 30 years.
The roller compacts each pass while the asphalt is hot, taking the 3 inches laid down to 2.5 inches compacted across the whole drive.
Paving in McComb
Edges are compacted beside the paver so they keep their shape. An old driveway with crumbling edges can often be repaired if the base is sound.
Driveway repair
Once the driveway has cured for 6 to 12 months, it gets its first sealcoat: cracks filled, then two coats. After that, every 1 to 2 years.
Sealcoating in McCombDriveways are quoted after we see them. We come out by appointment, look at the ground, the grade, and what is there now, and ask what you drive and pull. An old driveway may need to come out and be hauled off, or it may be sound enough to pave over. If the base underneath has failed, we tell you, because new asphalt over a bad base brings the same problems back.
The written quote is free and goes out from the office, often the same day. It has a line item for each service, each with its own scope, so a turnaround, a parking pad, or a later sealcoat each shows up on its own line.
After you approve it and pay the deposit, most driveways are scheduled within 2 to 3 weeks. The paving itself usually takes 1 to 2 days. We never sub out paving, so the crew in your driveway works for us. If the shop has to keep running that week, tell us, and we plan the day around it.
We check the ground, the grade, and the old surface, and ask which trucks and trailers use the drive.
Free and often sent the same day, with each service on its own line and its own scope.
Our own crew builds the base, lays and rolls the asphalt, and finishes the edges, usually in 1 to 2 days.
Yes. We pave driveways in McComb and across Pike County, including long runs back to a shop, a barn, or a parking pad.
Yes, when the base is built for it. Soft spots are dug out first, the base is compacted, and the areas where trucks turn and park get the most attention.
Heavy trucks should wait 48 to 72 hours. Cars can use it after about 24 hours.
Yes. Each one is its own line item on the quote, so you can see what it adds before you decide.
It can be. Concrete costs more up front and can last 30 years or more, and it suits spots where heavy things sit parked. Many owners pave the drive in asphalt and pour a concrete pad at the door.
Yes. We work across McComb and Pike County, by appointment at your property.
Most driveways are scheduled within 2 to 3 weeks of the deposit. The paving usually takes 1 to 2 days.
With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.
Sometimes. If the base under it is still solid, a new layer of asphalt over the old one can work. If the old driveway is cracked through or sinking, it has to come out first so the new one isn't built on a failing base.
Wait 6 to 12 months so the asphalt can cure, then sealcoat it and reseal every 1 to 2 years.
Tell us about the job and we'll send a written quote with a line item for each service.