Long new asphalt driveway leading up to a ranch house. PavePro, asphalt driveway paving contractor serving McComb, MS.

Asphalt Driveway Paving in McComb, MS

Free written quotes on asphalt driveways in McComb, MS.

Asphalt driveway paving in McComb

New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.

We pave driveways in McComb and across Pike County, from Edgewood to Fernwood, with crews coming from our Madison and Jackson locations.

typical thickness3 inches laid, 2.5 inches compacted
base materialCompacted crushed limestone
cure timeCars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months

How we do it

What moves the price

Paving a McComb asphalt driveway back to the shop

Plenty of driveways do more than get a car to the garage. They carry a pickup with a trailer, a load of parts, or a machine headed to the shop out back. We pave those driveways the way we pave a yard: figure out what drives on each part, then build for it.

Every driveway starts with the ground. Soft spots are dug out and rebuilt, a compacted crushed limestone base goes down, and the grade is shaped so water runs off the edges instead of sitting on the lane. The asphalt is laid 3 inches thick and rolled to 2.5 inches compacted.

Where the drive reaches the shop, we can widen it into a turnaround or a pad so a truck and trailer can swing around without cutting across the yard. Tell us what you pull and where it parks, and the layout follows from that. If the shop sees deliveries, mention that too. A box truck backing up to the door puts its weight on a different path than your own pickup does, and the base gets built for whichever one is heaviest.

Roller and crew finishing a new driveway in front of a metal barn. PavePro, asphalt driveway paving contractor serving McComb, MS.
Wide curving asphalt driveway edged in fresh topsoil. PavePro, asphalt driveway paving contractor serving McComb, MS.

Turnaround at the shop

A wider section near the shop door gives a truck and trailer room to turn, so nobody has to back down the full length of the drive.

How we pave driveways
Fresh asphalt parking pad in front of a brick house. PavePro, asphalt driveway paving contractor serving McComb, MS.

Parking pad

A paved pad beside the drive keeps the trailer or work truck off the lane, and off the grass when the ground is soft.

Concrete pads in McComb
New asphalt driveway running along a wooden fence. PavePro, asphalt driveway paving contractor serving McComb, MS.

The long run in

A long drive from the road gets the same base, thickness, and edge line the whole way, from the street apron to the house and the shop.

Private lane paving

Where an asphalt driveway in McComb carries the most weight

On a driveway that serves a shop, the weight lands in a few spots: the apron at the street where trucks turn in, the bend toward the shop, and the place a trailer sits. Those spots get the most attention in the base work, because a heavy wheel on a soft spot is where ruts start.

Rolling matters as much as thickness. Our crews compact the mat while it is hot and tamp the edges down with plate compactors, so the sides hold their shape instead of crumbling under a tire that drifts off the lane. Where the drive meets the street, the shop slab, or a carport, we pave a clean, even transition so a trailer does not bounce over a lip every trip.

After paving, cars can use it in about 24 hours, and heavy trucks after 48 to 72 hours. The asphalt keeps curing for 6 to 12 months. During that time, avoid turning your wheels while the truck is sitting still, and set trailer jacks on a wide board instead of bare asphalt. With upkeep, the driveway lasts 20 to 30 years.

Crew and paving machine laying asphalt on a long driveway. PavePro, asphalt driveway paving contractor serving McComb, MS.
Roller operator compacting a new driveway. PavePro, asphalt driveway paving contractor serving McComb, MS.

Rolled tight

The roller compacts each pass while the asphalt is hot, taking the 3 inches laid down to 2.5 inches compacted across the whole drive.

Paving in McComb
Crew compacting the edge of new asphalt beside the paver. PavePro, asphalt driveway paving contractor serving McComb, MS.

Edges that hold

Edges are compacted beside the paver so they keep their shape. An old driveway with crumbling edges can often be repaired if the base is sound.

Driveway repair
Ride-on sealcoater coating a parking lot. PavePro, asphalt driveway paving contractor serving McComb, MS.

Sealcoat later

Once the driveway has cured for 6 to 12 months, it gets its first sealcoat: cracks filled, then two coats. After that, every 1 to 2 years.

Sealcoating in McComb

Getting a quote for an asphalt driveway in McComb

Driveways are quoted after we see them. We come out by appointment, look at the ground, the grade, and what is there now, and ask what you drive and pull. An old driveway may need to come out and be hauled off, or it may be sound enough to pave over. If the base underneath has failed, we tell you, because new asphalt over a bad base brings the same problems back.

The written quote is free and goes out from the office, often the same day. It has a line item for each service, each with its own scope, so a turnaround, a parking pad, or a later sealcoat each shows up on its own line.

After you approve it and pay the deposit, most driveways are scheduled within 2 to 3 weeks. The paving itself usually takes 1 to 2 days. We never sub out paving, so the crew in your driveway works for us. If the shop has to keep running that week, tell us, and we plan the day around it.

Skid steer tearing out an old asphalt driveway. PavePro, asphalt driveway paving contractor serving McComb, MS.

From first call to new asphalt

  1. 1

    Site visit

    We check the ground, the grade, and the old surface, and ask which trucks and trailers use the drive.

  2. 2

    Written quote

    Free and often sent the same day, with each service on its own line and its own scope.

  3. 3

    Paving day

    Our own crew builds the base, lays and rolls the asphalt, and finishes the edges, usually in 1 to 2 days.

Recent paving work

Questions about Asphalt Driveways

Do you pave driveways out to a shop or barn in McComb?
+

Yes. We pave driveways in McComb and across Pike County, including long runs back to a shop, a barn, or a parking pad.

Will an asphalt driveway hold up to a truck and trailer?
+

Yes, when the base is built for it. Soft spots are dug out first, the base is compacted, and the areas where trucks turn and park get the most attention.

When can I pull a loaded trailer onto my new driveway?
+

Heavy trucks should wait 48 to 72 hours. Cars can use it after about 24 hours.

Can you add a turnaround or a trailer pad?
+

Yes. Each one is its own line item on the quote, so you can see what it adds before you decide.

Should the pad in front of my shop be concrete instead?
+

It can be. Concrete costs more up front and can last 30 years or more, and it suits spots where heavy things sit parked. Many owners pave the drive in asphalt and pour a concrete pad at the door.

Do you pave driveways in Edgewood and Fernwood?
+

Yes. We work across McComb and Pike County, by appointment at your property.

How soon can my driveway be paved?
+

Most driveways are scheduled within 2 to 3 weeks of the deposit. The paving usually takes 1 to 2 days.

How long will my asphalt driveway last?
+

With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.

Can you pave over my old driveway instead of tearing it out?
+

Sometimes. If the base under it is still solid, a new layer of asphalt over the old one can work. If the old driveway is cracked through or sinking, it has to come out first so the new one isn't built on a failing base.

When should I sealcoat my new driveway?
+

Wait 6 to 12 months so the asphalt can cure, then sealcoat it and reseal every 1 to 2 years.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote