Fresh wet sealcoat in front of a shopping center. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Asphalt Sealcoating Services in Cleveland

Free written quotes on sealcoating in Cleveland, MS.

Asphalt sealcoating in Cleveland

Protection from UV, water, and oil. Two coats, dry in 24 to 48 hours.

We sealcoat apartment lots, townhome drives, and home driveways in Cleveland and across Bolivar County, including Chatmoss and South Fifth Avenue, with crews coming from our Madison and Jackson locations.

typical thickness2 coats commercial-grade sealant
base materialExisting asphalt, cracks filled
cure time24 to 48 hours before traffic

How we do it

What moves the price

Cleveland asphalt sealcoating that holds a lot between overlays

On a property that gets resurfaced in stretches, sealcoat is what keeps the waiting stretches from failing before their turn. Asphalt goes gray and brittle as the sun dries it out, and once the surface is brittle, cracks open and water works down into the base. Sealcoat slows that down. It cannot fix a failed base, so it belongs on pavement that is still sound.

The work starts with cleaning. The lot is blown off or pressure washed, and every crack is cleaned out and filled with hot-applied crack filler. Then the sealcoat goes on in two coats. On a large lot it is flood-coated with a squeegee machine.

New asphalt, including a fresh overlay, waits 6 to 12 months for its first coat while it cures. After that, two coats every 1 to 2 years keep it sealed. The sealcoat dries in 24 to 48 hours, and because it covers the old lines, the lot gets restriped once it has dried.

Ride-on sealcoater spraying a parking lot. PavePro, asphalt sealcoating contractor serving Cleveland, MS.
Crew cleaning a lot with a pressure wand before sealing. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Cleaned before it's sealed

Dirt, oil, and loose debris come off the lot first, so the sealcoat goes down on clean asphalt instead of on top of whatever was sitting there.

PavePro in Cleveland
Crew member hand-sealing cracks with a pour cart. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Cracks filled hot

Every crack gets hot-applied crack filler before the first coat, so water can't keep working into the base under the new seal.

Crack filling
Sealcoated commercial parking lot with long afternoon shadows. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Two coats, every time

Two coats go on, not one, and the lot gets sealed again every 1 to 2 years so the surface never sits bare for long.

Asphalt sealcoating

Cleveland sealcoating by section, with every building reachable

Sealcoat needs the pavement empty, and it needs to stay empty until it dries. On an apartment property, that means the lot is sealed by section. We work out the sections with the manager so every building still has a route in and out, and residents know which day their cars need to be somewhere else.

A section is cleaned, its cracks are filled, and the two coats go on. It stays coned or taped off while it dries, which takes 24 to 48 hours, and then the next section follows. The drive lanes that connect everything can be sealed last, or one half at a time, so traffic always has a way through the property.

Because sealcoat covers the stripes, each section gets restriped once it is dry. Our own crews paint the stalls, ADA spaces, fire lanes, and arrows in commercial fast-dry paint that dries in about 30 minutes. If the old layout never worked, the stalls can be laid out differently while the lot is a blank surface.

Aerial view of sealcoat going on a commercial lot one section at a time. PavePro, asphalt sealcoating contractor serving Cleveland, MS.
Ride-on sealcoater coating a parking lot. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Coated in passes

Sealcoat goes down across one section at a time. Stretches too far gone for sealcoat go on the overlay plan instead of getting sealed.

Overlays in Cleveland
Crew working around a storm drain on a freshly sealed lot. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Worked around the drains

Storm drains and curb lines get careful hand work so the sealcoat stops clean. Broken asphalt around an inlet is repaired before it is sealed.

Parking lot repair
Crisp new parking lines on a dark sealed lot. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

Striped once it's dry

Fresh lines go back down on the dry sealcoat in fast-dry paint, laid out and painted by our own crews, never a sub.

Striping in Cleveland

Sealcoat or overlay for a Cleveland apartment drive

Sealcoat is upkeep. It protects pavement that is still sound, and it does nothing for a stretch where the base has already given out. Sealing over alligator cracks, potholes, or sunken spots makes the lot look better for a season and leaves the real problem underneath.

When we walk a property, we tell you which stretches are good candidates for sealcoat and which need repair or an overlay first. On a lot of apartment properties it ends up a mix: the main drive and the dumpster approaches need asphalt work, and the parking rows can be cleaned, crack filled, and sealed.

Sealcoating can usually be quoted from photos and a rough size, so a manager can send pictures instead of waiting on a walk-through. Repairs and overlays are quoted after we come out to the property by appointment. Every quote is free and written, with a line item for each service, each with its own scope.

Fresh overlay over an existing commercial parking lot. PavePro, asphalt sealcoating contractor serving Cleveland, MS.

How a Cleveland sealcoat job is sequenced

  1. 1

    Repair what failed

    Failed spots are patched or overlaid first, since sealcoat cannot fix a failed base.

  2. 2

    Clean and fill

    The section is cleaned and every crack gets hot-applied crack filler before any sealcoat goes down.

  3. 3

    Seal and restripe

    Two coats go on and dry in 24 to 48 hours, then the lines are painted back down.

Recent paving work

Questions about Sealcoating

Who sealcoats apartment parking lots in Cleveland, MS?
+

PavePro does, with our own crews. We sealcoat apartment lots, townhome drives, and driveways in Cleveland and across Bolivar County, and we stripe them afterward in-house.

Can you seal our lot without closing the whole property?
+

Yes. We seal by section, so every building still has a route in and out while one section dries.

How long do residents stay off a sealed section?
+

The sealcoat dries in 24 to 48 hours, and the section stays closed until it does.

When should a fresh overlay get its first sealcoat?
+

After 6 to 12 months, once the new asphalt has cured.

Will the stripes come back after sealcoating?
+

Yes. Sealcoat covers the old lines, so our own crews restripe each section once it is dry, and the layout can change if you want it to.

Do you need to visit to quote sealcoating?
+

Usually not. Sealcoating can usually be quoted from photos and a rough size. Repairs and overlays need a visit to the property by appointment.

Is sealcoat worth it on a lot that is due for an overlay?
+

Not on the stretches that have failed. Sealcoat cannot fix a failed base, but it can hold the sound stretches until the overlay reaches them.

Can sealcoating fix cracks or potholes?
+

Sealcoating is protection, not repair. It will not fix larger cracks or potholes, but it does keep new ones from forming.

How often should I sealcoat my asphalt?
+

Sealcoat new asphalt after 6 to 12 months, then every 1 to 2 years. It is the simplest way to protect your investment.

Why do you apply two coats instead of one?
+

One coat leaves thin spots that wear through early. The second coat fills them in and evens out the protection across the whole surface.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote