Ride-on sealcoater spraying a parking lot. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Asphalt Sealcoating Services in Greenville

Free written quotes on sealcoating in Greenville, MS.

Asphalt sealcoating in Greenville

Protection from UV, water, and oil. Two coats, dry in 24 to 48 hours.

We sealcoat shop, office, and church lots and home driveways across Greenville and Washington County, with crews from our Madison and Jackson locations.

typical thickness2 coats commercial-grade sealant
base materialExisting asphalt, cracks filled
cure time24 to 48 hours before traffic

How we do it

What moves the price

Asphalt sealcoating in Greenville, one part of the lot at a time

Sealcoat needs an empty surface while it dries, and that takes 24 to 48 hours. For a shop or office with one lot, closing all of it for that long is often not an option. So on many lots we coat one part at a time. The first part is sealed while customers park on the rest, and once it is dry, traffic moves over and we seal the other side.

Where the lot allows it, the entrance and the path to your door are the last pieces we coat, so people can reach you through most of the job. On a lot that is too tight to split, we look at your calendar and set the work for the days you are closed or slowest.

Every part gets the same work: cleaned, cracks filled with hot-applied crack filler, and two coats, flood-coated with a squeegee machine on large lots. Sealcoat covers the old lines, so our own crews restripe each part once it is dry, before traffic goes back on it.

Aerial view of sealcoat going on a commercial lot one section at a time. PavePro, asphalt sealcoating contractor serving Greenville, MS.
Aerial view of a large office lot partway through sealcoating. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Split lot

Part of the lot stays open while the other part dries. Then traffic swaps sides, and the second part gets its two coats.

PavePro in Greenville
Fresh wet sealcoat in front of a shopping center. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Door last

The strip in front of your door is planned for the end of the job, so customers have a way in for as long as possible.

Parking lots in Greenville
Crisp new parking lines on a dark sealed lot. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Lines back

Sealcoat covers the old stripes. Our own crews repaint each part once it is dry, so it reopens with the stalls already marked.

Striping in Greenville

Sealcoating a Greenville church lot on the quiet days

Most church lots have days in the week when hardly anyone parks on them. Those are the days we sealcoat. Start early in the week, and the coats have the 24 to 48 hours they need to dry before the next service or event. Send us the calendar, and tell us if something comes up, like a funeral, so we can move the date.

Sealcoat protects the asphalt from sun, water, and oil, and it brings back the dark finish. What it cannot do is fix a failed base or close a crack. So the cracks are filled first, and the spots where cracks have formed a tight web are cut out and patched before any coating goes on.

A cured lot needs sealcoat every 1 to 2 years. A newly paved church lot waits 6 to 12 months for its first coat while the asphalt cures. If your lot is close to due, quote it before the lines fade too far, since sealcoat and restriping go on the same quote and the same visit.

Aerial view of a sealcoated and restriped church lot along the road. PavePro, asphalt sealcoating contractor serving Greenville, MS.
Crew blowing out cracks before filling them. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Cracks first

Cracks are blown clean and filled with hot filler before the sealcoat goes on, so water stops reaching the base under the coating.

Crack filling
Sealcoat machine operator coating a commercial lot. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Two coats

Two coats on every job, flood-coated with a squeegee machine on larger lots and worked into the surface of the pavement.

Asphalt sealcoating
Roller finishing a new patch in a commercial lot. PavePro, asphalt sealcoating contractor serving Greenville, MS.

Patched first

Where the base has failed, the area is cut out, rebuilt, and rolled level before sealing, since sealcoat cannot repair what is underneath.

Parking lot repair

Getting a Greenville sealcoating quote from photos

Most sealcoating jobs can be quoted from photos, without a site visit. Send wide shots of the lot or driveway, a few close-ups of cracks and worn spots, and a rough size. We write a free quote, often the same day. If the photos show broken pavement or soft spots, we set an appointment to look at it before we price it, so the number reflects what the lot really needs.

The quote lists sealcoat, crack filling, patching, and restriping as separate line items, each with its own scope. If the lot needs repairs before sealcoat will do any good, we say so on the quote instead of coating over the problem.

Once it is approved and the deposit is paid, most jobs are scheduled within 2 to 3 weeks. When you send the photos, tell us which days your lot can close, in part or in full, so the schedule fits your hours from the start. Home driveways in neighborhoods like West Manor and Sunridge Cove are quoted the same way.

Freshly sealed lot at an office building entrance. PavePro, asphalt sealcoating contractor serving Greenville, MS.

What a photo quote needs

  1. 1

    The whole lot

    Wide photos from a few angles, so we can see the full surface, the entrances, and the drive lanes.

  2. 2

    The trouble spots

    Close-ups of cracks, old patches, and any areas that hold water or look like they are breaking up.

  3. 3

    Your open days

    The days your lot can close, in part or in full, for the 24 to 48 hours it takes to dry.

Recent paving work

Questions about Sealcoating

Who does asphalt sealcoating in Greenville, MS?
+

PavePro does, with our own crews. We sealcoat shop, office, and church lots and home driveways across Greenville and Washington County.

Can you sealcoat part of our lot and leave the rest open?
+

Yes, on most lots. We coat one part while customers park on the other, then switch once the first part is dry.

When is the best time to sealcoat a church lot?
+

The quiet days early in the week. Sealcoat dries in 24 to 48 hours, so a coat laid then is usually dry before your next service.

Do you fill cracks before sealcoating?
+

Yes. Every job starts with cleaning and hot-applied crack filler. Failed areas are patched before any coating goes on.

Who restripes the lot after sealcoating?
+

Our own crews. Sealcoat covers the old lines, so each part of the lot is restriped in fast-dry paint once the coat is dry.

When does a new lot get its first sealcoat?
+

After 6 to 12 months, once the asphalt has cured.

Do you sealcoat home driveways in Greenville?
+

Yes. Driveways get the same cleaning, crack filling, and two coats as a lot.

How often should I sealcoat my asphalt?
+

Sealcoat new asphalt after 6 to 12 months, then every 1 to 2 years. It is the simplest way to protect your investment.

Can you quote sealcoating from photos?
+

Usually, yes. Send photos and the rough size of the area, and we will put together a free written quote. If we see damage that needs repair, we will come look first.

Why do you apply two coats instead of one?
+

One coat leaves thin spots that wear through early. The second coat fills them in and evens out the protection across the whole surface.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote