Truck route
The path from the entrance to the docks or bay doors gets the heavier build, since it carries every loaded truck that comes through the property.
Industrial paving
Free written quotes on parking lot paving in Collins, MS.
New lots and repaves for businesses, churches, and schools, with ADA layouts.
We pave shop lots, yards, and business parking in Collins and across Covington County, from Downtown Collins to Eastside. Our crews come out from our Madison and Jackson locations.
| typical thickness | Compacted hot mix, sized per lot |
|---|---|
| base material | Compacted crushed aggregate base |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
Most business lots carry two kinds of traffic. Customers and staff park cars near the door. Delivery trucks, service trucks, and trailers come through the same entrance and head for the back. Where those routes cross is where a lot breaks down first.
We start by drawing the routes. At the walk-through, we trace the path trucks take from the road to the dock or bay doors, and we mark the rows where only cars park. The truck route and the entrance get a heavier build, and the car rows get what they need. Thickness is spec'd per job after we see the site, everything sits on a compacted crushed limestone base, and the grade is shaped to move water toward the drains.
Separating the routes is half paving and half layout. After the asphalt is down, our own crews stripe it: lane lines, arrows, and hatched areas that keep cars out of the truck path, plus stalls and ADA spaces near the entrance. The striping is in-house, so there is no second company to schedule.
The path from the entrance to the docks or bay doors gets the heavier build, since it carries every loaded truck that comes through the property.
Industrial paving
Entrances take hard turns from every vehicle on the property. We build them for the heaviest one and tie them in cleanly at the road edge.
Parking lot paving
Customer and staff parking gets a build sized for cars, then fresh stalls and ADA spaces. The savings go toward the truck route.
Paving in CollinsA worn lot rarely needs the same fix everywhere. The truck route may have failed down to the base while the car rows only need a new surface. Treating them the same means overspending on one or under-building the other.
Failed areas get cut out and rebuilt first, so new asphalt is never laid over a soft spot. Where the base is sound, the old surface can be milled at curbs, slabs, and doorways and then overlaid, keeping the finished lot level with what it meets. Where a whole lane has failed, rebuilding it is the fix that lasts. With upkeep, a well-built lot lasts 20 to 30 years.
The lot does not have to close all at once. We pave in sections and plan the order with you, so trucks keep a way in and customers keep somewhere to park. Cars can use a finished section after about 24 hours, and loaded trucks after 48 to 72 hours. The work is planned around your hours.
A skid steer planer trims old asphalt along curbs and doorways, so the overlay stays level with them instead of building up a lip.
Asphalt milling
Failed spots in the heavy lanes are cut out, rebuilt, and rolled before any new surface goes down, so the overlay has solid ground under it.
Parking lot repair
Car rows that are worn on top but sound below get a new layer of asphalt, rolled smooth and ready for fresh lines.
ResurfacingParking lots are quoted on site. We come out by appointment, check the base, the drainage, and the pavement there now, and ask what comes through: how many trucks, how heavy, and where they park or unload. Drains, curbs, and door thresholds set how high the new surface can sit, so we check those too.
The quote is free and written, often sent the same day. It has a line item for each service, each with its own scope. Paving the truck route, overlaying the car rows, sealcoating, and striping each stand on their own, so you can see what each zone costs and phase the work if you want.
Once you approve it and pay the deposit, most lots are scheduled within 2 to 3 weeks, and urgent repairs can move up, sometimes within 10 days. Paving usually takes 1 to 2 days. A job that adds sealcoating and striping usually runs 2 to 5 days.
We walk the lot with you and mark where trucks run and where only cars park.
Base, drainage, curbs, and drains are checked so the new surface fits and sheds water.
Free, with a line item for each service, each with its own scope. Often the same day.
PavePro, with our own crews. We pave lots in Collins and across Covington County and never sub out the paving.
Not usually. The truck route and entrance get the heavier build, and car rows get what cars need. Thickness is spec'd per job after we see the site.
Yes. We pave in sections and plan the order with you, so customers have parking and trucks have a way in.
Yes. Each area is its own line item, so failed truck lanes can be rebuilt now and the car rows overlaid or sealcoated later.
Yes. Failed areas are cut out and rebuilt first. An overlay on a failed base brings the same problems back.
Yes. A fresh surface is the best time to rework the routes, stalls, and hatched areas. Our own crews lay it out and stripe it.
No. Two lots that look alike can carry very different loads, so we see the site first. The written quote is free.
Cars and other light vehicles can usually drive on new asphalt in about 24 hours. Heavy trucks need 48 to 72 hours.
Our own employees do it. Stall lines, ADA spaces, fire lanes, arrows, crosswalks, and custom markings are all done in-house, on the same schedule as the paving.
Wait 6 to 12 months after paving so the asphalt can cure. After that, sealcoat every 1 to 2 years.
Tell us about the job and we'll send a written quote with a line item for each service.