Finished broom-finish concrete driveway. PavePro, concrete driveway contractor serving Petal, MS.

Concrete Driveway Installation in Petal, MS

Free written quotes on concrete driveways in Petal, MS.

Concrete driveways in Petal

New installs and replacements, finished clean. Built for 30+ years.

We pour concrete driveways in Petal and across Forrest County, including Sheeploe, Macedonia, and Hillcrest, with crews coming from our Madison and Jackson locations.

typical thicknessSpec'd per job
base materialCompacted aggregate base
cure timeWalk on in 24 hours, drive on in 7 days, full cure 28 days

How we do it

What moves the price

Building a concrete driveway in a Petal subdivision

A concrete driveway in a subdivision has to meet the street at one end and the garage at the other, and it sits in plain view of every neighbor. It should look straight, square, and clean for a long time. Concrete lasts 30+ years, and how well it holds up comes down to the work under and inside the slab.

We start with the base. The old driveway comes out if there is one, soft spots are dug out, and the ground is compacted so the slab sits on firm, even support. Rebar goes in next, so the slab holds together if the ground moves. The thickness is spec'd for what you park on it.

Then the concrete is placed, leveled, and given a clean broom finish for grip. Control joints are cut into the slab, so the cracks all concrete eventually gets stay hairline and run along the joints instead of across the middle. All of it is done by our own employees. We don't sub out concrete work.

Crew raking concrete into a driveway form. PavePro, concrete driveway contractor serving Petal, MS.
Crew spreading concrete over driveway mesh. PavePro, concrete driveway contractor serving Petal, MS.

Reinforced before the pour

Reinforcement is set over the compacted base before the concrete arrives, so the finished slab holds together as one piece over the years.

Concrete driveways
Crew finishing a concrete driveway pour. PavePro, concrete driveway contractor serving Petal, MS.

Finished by hand

Our own finishers work the surface while the concrete is still wet, then give it a broom finish so tires and shoes can grip.

Paving in Petal
Freshly poured concrete driveway inside the wood forms. PavePro, concrete driveway contractor serving Petal, MS.

Square forms

Wood forms set the edges before the pour, so the driveway runs straight from the garage to the street and lines up with the walks.

Concrete work

Choosing a concrete driveway in a Petal neighborhood

Concrete costs more up front than asphalt. In return, it lasts 30+ years. Asphalt usually costs less up front and lasts 20 to 30 years with sealcoating every 1 to 2 years. Neither one is the wrong answer. It depends on your budget, how long you plan to stay, and what you want the front of the house to look like.

If your HOA reviews driveway changes, switching from asphalt to concrete may need its approval. We don't know your HOA's rules, so check with them first. The written quote helps there: it is free, often ready the same day, and has a line item for each service, each with its own scope, including the tear-out of the old driveway if there is one.

Neighbors who want concrete too get their own quotes. Each driveway is its own job, measured and scoped for that home. We don't give prices over the phone, because the size, the tear-out, and the ground underneath change from one lot to the next.

Fresh concrete slab with a smooth finish beside a house. PavePro, concrete driveway contractor serving Petal, MS.
Concrete truck pumping into a residential driveway form. PavePro, concrete driveway contractor serving Petal, MS.

Poured to fit your lot

The truck places concrete straight into forms built for your driveway's size and shape, and the crew spreads it before it starts to set.

Request a quote
Finisher floating a fresh concrete driveway by a garage. PavePro, concrete driveway contractor serving Petal, MS.

Or go with asphalt

Weighing asphalt instead? It costs less up front. Concrete like this, floated level up to the garage, costs more and lasts 30+ years.

Asphalt driveways in Petal
Fresh concrete pad at a home. PavePro, concrete driveway contractor serving Petal, MS.

Room to park

Parking pads and wider aprons can go on the same quote, each with its own line and scope, spec'd for what you park on them.

Concrete driveways

From the pour to parking on a Petal concrete driveway

Once the quote is approved and the deposit is paid, most driveways are scheduled within 2 to 3 weeks. The old driveway comes out, the base goes in, the forms and rebar are set, and then the concrete is poured and finished by our own crew.

After that, it needs time. You can walk on it after 24 hours. Cars wait about 7 days, so plan to park somewhere else for that week. If your HOA limits parking on the street, ask them how they want it handled before the pour, so there are no surprises when the forms come off.

The slab keeps gaining strength until it reaches full cure at 28 days. After that, a concrete driveway built on a compacted base, with rebar and cut joints, lasts 30+ years. The broom finish keeps its grip, and the joints keep the cracks where they belong. If a moving truck or a delivery is coming that month, tell us when you book, and we plan the pour date around it.

Finishers working a fresh concrete driveway. PavePro, concrete driveway contractor serving Petal, MS.

The concrete clock

  1. Walk on it

    Foot traffic is fine after 24 hours. Keep anything with wheels off the new slab until then.

  2. Drive on it

    Cars can use the driveway after about 7 days. Park somewhere else until then.

  3. Full cure

    The slab reaches full cure at 28 days and is built to last 30+ years.

Recent paving work

Questions about Concrete Driveways

Do you pour concrete driveways in Petal, MS?
+

Yes. Our own employees pour concrete driveways in Petal and across Forrest County. We don't sub out concrete work.

Will my HOA need to approve a concrete driveway?
+

That depends on your HOA's rules, so check with them. Our free written quote lists the scope, so you have something clear to submit.

Is concrete or asphalt better for a subdivision driveway?
+

Concrete costs more up front and lasts 30+ years. Asphalt usually costs less up front and lasts 20 to 30 years with upkeep. It comes down to budget and how long you plan to stay.

When can I drive on a new concrete driveway?
+

After about 7 days. You can walk on it after 24 hours, and it reaches full cure at 28 days.

What finish goes on a concrete driveway?
+

A clean broom finish, which gives tires and shoes grip.

Can my neighbor and I both get concrete driveways?
+

Yes. Each home gets its own written quote and scope.

How soon can my concrete driveway be scheduled?
+

Most driveways are scheduled within 2 to 3 weeks of the deposit.

How thick should a concrete driveway be?
+

It depends on how you will use it. We spec the thickness and rebar per job, and heavier vehicles like trucks or RVs get a thicker pour.

Will a concrete driveway crack?
+

All concrete can crack over time, especially over Mississippi's clay soils that move with moisture. We control it with a compacted base, rebar, and cut joints so any cracking stays hairline and controlled.

Do you remove my old driveway?
+

Yes. We break out the old concrete or asphalt, haul it away, and regrade before we pour the new driveway.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.