New asphalt driveway running along a wooden fence. PavePro, asphalt paving contractor serving Yazoo City, MS.

Asphalt Paving Company in Yazoo City MS

Free written quotes for driveways, parking lots, sealcoating, and striping in Yazoo City, MS.

Asphalt paving services in Yazoo City, MS

Asphalt paving in Yazoo City, built to the owner's spec

Streets, public lots, and home driveways all get paved by the same people at PavePro: our own crews. We never sub out paving. Striping, ADA markings, and concrete work are done in-house by our own employees too, so one company answers for the whole job, from the base to the last crosswalk.

In town and across the county, we pave and overlay streets, roads, and subdivision roads, pave and repair parking lots, sealcoat and stripe them, and pour concrete. When the owner or an engineer has plans and specs, we build to them. When there are none, we look at the road and recommend a scope sized to its traffic. Homeowners get the same crews for asphalt and concrete driveways. Every job is done by appointment at your property.

Quotes are free and written, and the plan for keeping traffic moving is settled before the first truck shows up. Call at any hour or request one online.

Aerial view of a crew paving a rural road with a roller. PavePro, asphalt paving contractor serving Yazoo City, MS.

Street and road paving in Yazoo City, to the owner's plans

A public road has a spec behind it, or it should. The city, the county, or their engineer sets the pavement section, the mix, the grades, and how the new surface ties in at intersections, driveways, and drains. Our job is to build exactly that. We read the plans before we price the work, and we ask about anything unclear before the job starts, not halfway through it.

Where a road has no plans, we walk it with the owner. We check the grade, the drainage, the existing pavement, and the traffic it carries, then recommend a scope. Failed areas get cut out and rebuilt on a compacted crushed limestone base, edges are milled where curb and drain heights have to hold, and the surface is cleaned and tacked before new asphalt goes down.

The asphalt is laid to the specified section and rolled tight while it is hot. Light traffic can usually return in about 24 hours, and heavy trucks after 48 to 72 hours. With crack filling and upkeep, asphalt lasts 20 to 30 years.

Aerial view of a long new rural road between pine stands. PavePro, asphalt paving contractor serving Yazoo City, MS.
Crew paving a road edge with the paver and dump truck. PavePro, asphalt paving contractor serving Yazoo City, MS.

Laid to the section

The paver lays asphalt to the thickness and mix the plans call for, with the dump trucks feeding it steadily so the mat stays even from edge to edge.

Road and municipal paving
Roller compacting a new asphalt road lane. PavePro, asphalt paving contractor serving Yazoo City, MS.

Rolled while hot

Rollers compact each lane before the asphalt cools. That compaction is what lets a road carry trucks for years instead of rutting in the wheel paths.

Private roads and lanes
Paver and dump truck paving a street lane beside a pavilion. PavePro, asphalt paving contractor serving Yazoo City, MS.

Tie-ins that match

Where a new lane meets an intersection, a driveway, or a drain, the edge is matched so water and tires cross it without a lip.

Asphalt milling

Phased road paving in Yazoo City, around traffic

People still have to get to work, school, and home while their road is paved. So before we start, we sit down with the owner and put the phasing in writing: which sections close and in what order, what hours the crew works, where traffic goes in the meantime, and how residents, businesses, and buses get notice. Who handles permits and traffic control depends on who owns the road, and that is settled in writing too.

On the job, we pave by section or by lane where the road allows it, and keep entrances open where we can. A paved section stays closed until it is ready, then opens while the crew moves on to the next one.

Older roads often need milling first, so the new surface stays level with curbs, gutters, and drains instead of building up every time the road is repaved. Where the base has failed, that stretch is cut out and rebuilt before the new layer, so the same failure does not come back up through fresh asphalt.

Roller finishing a new road lane with the crew ahead. PavePro, asphalt paving contractor serving Yazoo City, MS.
Crew and paver paving a wooded road. PavePro, asphalt paving contractor serving Yazoo City, MS.

One lane at a time

Where the road is wide enough, one lane is paved while the other carries traffic, then the crew switches sides, so the road stays open in part.

Phased road paving
Aerial view of a milled drive lane ready for new asphalt. PavePro, asphalt paving contractor serving Yazoo City, MS.

Milled to the curb line

Milling takes off the worn top so the new surface meets curbs, gutters, and drains at the right height, instead of raising the road each time.

Resurfacing and overlays
Aerial view of a new overlay mat beside the old pavement. PavePro, asphalt paving contractor serving Yazoo City, MS.

Overlay or rebuild

When the base under a worn road is still solid, a new layer goes over it. Where the base has failed, that part is rebuilt first.

Asphalt repair

Parking lots, striping, and crosswalks in Yazoo City

Public buildings, parks, and offices need lots that hold up and markings people can read. We pave and repave those lots the same way we pave roads: built to the owner's spec where there is one, and spec'd per job after we see the site where there is not. Work is phased so the public keeps a way in, and the schedule is planned around your hours.

Once the asphalt is ready, our own employees stripe it. Stalls, ADA spaces and access aisles, fire lanes, arrows, crosswalks, hatched zones, and stencils are laid out by our crews, not a second contractor. The fast-dry paint is ready in about 30 minutes, and for some projects striping can be done at night or on weekends.

Upkeep keeps a lot in service longer. Cracks are cleaned out and filled with hot-applied crack filler, then two coats of sealcoat go on every 1 to 2 years and dry in 24 to 48 hours. Sealcoat covers the old lines, so the lot gets restriped after, and the layout can change then. For homeowners, we pave asphalt driveways and pour concrete driveways too.

Aerial view of a new parking lot with fresh white stripes. PavePro, asphalt paving contractor serving Yazoo City, MS.

Crosswalks

Hatched crossings mark where people walk across a lot or a drive lane, painted by our own employees once the new asphalt is ready for it.

Parking lot striping

Arrows and lanes

Arrows and lane lines tell drivers which way to go in and out, so traffic keeps moving through the lot instead of stacking up at the entrance.

Striping and markings

ADA spaces

ADA stalls and access aisles are laid out beside the sidewalk where people can use them, with the hatching and stencils done in-house by our own crews.

Parking lot paving

How a Yazoo City paving quote is written

There are no prices over the phone. For road, lot, and driveway paving, we review the plans if there are any, then come out by appointment and walk the site: the base, the grade, the drainage, and the traffic. The thickness on lots is spec'd per job after we see the site. Sealcoating and striping can usually be quoted from photos.

The quote is free and written, and it goes out from the office, often the same day. It has a line item for each service, each with its own scope, so an owner can see what milling, base repair, paving, and markings each cover, and decide what to fund now and what can wait. On a road job, the phasing plan goes in writing alongside it.

After approval and the deposit, most jobs are scheduled within 2 to 3 weeks, and urgent repairs can go sooner, sometimes within 10 days. Paving usually takes 1 to 2 days on an average job, and 2 to 5 days when sealcoating and striping are added.

Dump truck feeding the paver during an asphalt overlay. PavePro, asphalt paving contractor serving Yazoo City, MS.

From plans to pavement

  1. 1

    Plans or a road walk

    We read the owner's plans and specs, or walk the site with you and recommend a scope sized to the traffic.

  2. 2

    Written quote and phasing

    Each service is its own line item, and the sections, hours, and closures are agreed in writing before work starts.

  3. 3

    Pave, mark, reopen

    Our crews pave each section, stripe it in-house, and open it to traffic once it is ready.

How a paving job works

Paving in Yazoo City and nearby towns

Yazoo City is on our regular run. From Main Street Historic District and The Triangle to Broadway and Grand Avenue, we pave and seal driveways, parking lots, and private roads.

Tell us the address and rough size and we'll send a free written quote.

Recent paving work

Reviews from PavePro customers

Google review
★★★★★

"Patrick with PavePro is great to work with. Very reasonable pricing. Did fantastic job seal coating and striping our church parking lot. Would definitely recommend to anyone!"

Taylor Crysel, Mississippi
Google review
★★★★★

"PavePro has been a total Godsend for me. I'm the facilities manager over all our properties at a property management company here in Jackson, MS. I can just jump on their website, fill out the quick form, or even text their number with the address and I get a quote back fast. Works great for our managed properties, but they've also given me free estimates on places we're not even managing yet just so I can put repair numbers in an offer when we're trying to buy something. That flexibility has saved me a ton of headaches. No runaround, no 'we only quote our customers' nonsense. They just help.Highly recommend them if you're in Jackson or the surrounding area and need paving or asphalt work."

Shannon H, Jackson, MS
Google review
★★★★★

"Amazing to work with Patrick Wallace at PavePro. I would recommend to anyone needing help with paving, seal coating, or parking lot striping. He makes all projects seamless, and work is the highest quality."

Jeanne Burns, Mississippi

Yazoo City paving questions

Do you pave public streets and roads in Yazoo City, MS?
+

Yes. We pave streets, roads, and public lots with our own crews, built to the plans and specs the owner or engineer provides. We never sub out paving.

Do you work from an engineer's plans?
+

Yes. If there are plans and specs, we price and build to them. If there are none, we walk the road and recommend a scope sized to its traffic.

Can a Yazoo City street stay open while you pave it?
+

Often in part. We pave by section or by lane where the road allows it, and agree on the hours and closures with the owner in writing before work starts.

Who handles permits and traffic control?
+

That depends on who owns the road and how the job is set up. We settle it in writing before work starts, so nothing is left to guesswork.

When can traffic use a newly paved road?
+

Light traffic can usually return in about 24 hours, and heavy trucks after 48 to 72 hours. The asphalt keeps curing for 6 to 12 months after that.

Do you stripe crosswalks and arrows too?
+

Yes. Crosswalks, arrows, stalls, ADA spaces, fire lanes, and hatched zones are done by our own employees. The fast-dry paint is ready in about 30 minutes.

Do you pave home driveways in Yazoo City too?
+

Yes. We pave asphalt driveways and pour concrete driveways in neighborhoods like Brickyard Hill, Broadway, and The Triangle, and across the county, by appointment at your property.

Where is PavePro located?
+

Our locations are in Madison and Jackson, and our crews come to you. Every job is done by appointment at your property, and quotes are free.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote