Entrances
Everything that comes into the lot crosses the entrance, and most of it turns there. It gets built for the heaviest vehicle that uses it.
Parking lot paving
Free written quotes on parking lot paving in Yazoo City, MS.
New lots and repaves for businesses, churches, and schools, with ADA layouts.
We pave parking lots for public buildings, churches, and businesses around Broadway, Grand Avenue, and The Triangle in Yazoo City and across Yazoo County, with crews coming from our Madison and Jackson locations.
| typical thickness | Compacted hot mix, sized per lot |
|---|---|
| base material | Compacted crushed aggregate base |
| cure time | Cars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months |
A lot that serves the public, at an office, a park, a public building, or a business, often comes with a spec. The owner or an engineer may set the pavement section, the grades, the drainage, and the striping layout before anyone is hired. When that exists, we price and build to it, and we ask about anything unclear before the job starts.
When there is no spec, we work one out with you. We walk the lot, check the base and the drainage, and look at what drives on it: cars, delivery trucks, garbage trucks, buses. Thickness on lots is spec'd per job after we see the site, so entrances and truck lanes are built heavier than the stalls beside them. Every area sits on a compacted crushed limestone base and is graded so water leaves the surface.
That way the money goes where the weight is. With crack filling and sealcoating along the way, asphalt lasts 20 to 30 years, and it usually costs less up front than concrete.
Everything that comes into the lot crosses the entrance, and most of it turns there. It gets built for the heaviest vehicle that uses it.
Parking lot paving
The paver runs tight to the curb so the new surface meets it flush and water runs to the drains instead of pooling at the edge.
Roads, lots, and driveways
Rollers compact each pass while the asphalt is hot, which keeps stalls and drive lanes from rutting under the traffic they see every day.
Heavy-duty lotsMost public lots cannot close for a week. Before the job, we map the phases with the owner: which section closes first, where people park in the meantime, how the entrance stays open, and when each area opens back up. The plan goes in writing, and the work is planned around your hours. If you have events, shift changes, or deliveries, tell us and the sequence is built around them.
On an older lot, paving usually starts with repairs. Spots where the base has failed are cut out and rebuilt, worn areas can be milled so the new surface stays level with curbs and drains, and then the new asphalt goes down section by section. Tell us about any area that holds water after a storm, so it is handled in the repair work and not paved over.
Cars can usually use a finished section after about 24 hours, and heavy trucks after 48 to 72 hours. Paving takes 1 to 2 days on average, and 2 to 5 days when the job includes sealcoating and striping by our own employees.
Failed spots are cut out, rebuilt, and rolled before the new layer, so the same failure does not come back up through fresh asphalt.
Parking lot repair
Where the base is sound, a new layer goes over the old surface and is compacted to carry the cars and trucks the lot sees every day.
Resurfacing and overlays
Each section is paved, edged, and kept closed until it is ready, so people keep a way in while the crew moves on to the next one.
Phased pavingIf the lot has plans and specs, send them over and we price to them. If not, we come out by appointment, walk the surface, check the base and drainage, and note where trucks turn and stop. We also check where the new surface has to meet curbs, drains, and building entrances, since those heights have to hold. There are no prices over the phone, and thickness is spec'd per job after we see the site.
The written quote is free and goes out from the office, often the same day. It has a line item for each service, each with its own scope: repairs, milling, paving, and striping by our own crew. An owner can see what each part covers and decide what to do now and what can wait for next year's budget.
After approval and the deposit, most lots are scheduled within 2 to 3 weeks, and urgent repairs can go sooner, sometimes within 10 days. We never sub out paving, so the crew on your lot works for us.
We price to the owner's spec, or check the base, grade, and drainage and recommend one for the lot.
Sections, hours, and closures are agreed in writing before work starts, along with the quote.
Our own crews pave each section, then stripe the stalls, ADA spaces, and fire lanes once it is ready.
Yes. If there are plans and specs, we price and build to them. If not, we look at the lot and spec it per job after we see the site.
Usually in part. We pave in sections and agree on the order with you in writing, so people keep a way in.
Usually, yes. They carry more weight and more turning than car stalls, so they get a heavier spec, set per job after we see the site.
Yes. Repairs and paving are separate line items on the quote, each with its own scope, so you can fund them in stages.
Paving takes 1 to 2 days on average. With sealcoating and striping added, most projects run 2 to 5 days.
Yes. We pave lots in town and across the county, by appointment at your property.
No. We review your plans or see the lot first, then send a free written quote, often the same day.
It depends on the lot. We spec the asphalt thickness and base to the traffic your lot actually carries, so heavier truck traffic gets more.
Our own employees do it. Stall lines, ADA spaces, fire lanes, arrows, crosswalks, and custom markings are all done in-house, on the same schedule as the paving.
Wait 6 to 12 months after paving so the asphalt can cure. After that, sealcoat every 1 to 2 years.
Tell us about the job and we'll send a written quote with a line item for each service.