New concrete driveway curing in front of a garage. PavePro, concrete driveway contractor serving Yazoo City, MS.

Concrete Driveway Installation in Yazoo City, MS

Free written quotes on concrete driveways in Yazoo City, MS.

Concrete driveways in Yazoo City

New installs and replacements, finished clean. Built for 30+ years.

We pour concrete driveways for homeowners around Brickyard Hill, Grand Avenue, and The Triangle in Yazoo City and across Yazoo County, with crews coming from our Madison and Jackson locations.

typical thicknessSpec'd per job
base materialCompacted aggregate base
cure timeWalk on in 24 hours, drive on in 7 days, full cure 28 days

How we do it

What moves the price

Concrete driveways in Yazoo City, from the street to the garage

A concrete driveway is two jobs that have to agree: the long slab up to the house, and the short stretch where it meets the street. The street end takes the turning and the step down from the road, and if the road belongs to the city or county, they may have their own rules about how that edge is built. Ask them first, and we pour to what they require.

From there, the rest of the driveway is laid out with the slope it needs to drain. Water should run off the concrete toward the street or the yard, never toward the garage. The thickness is spec'd for what you park on it, whether that is a car, a work truck, or a camper.

Concrete costs more up front than asphalt and lasts 30 years or more. Our own employees pour it. We do not hire out the concrete work, so the people who set the forms are the same people who finish the slab.

Concrete crew working fresh concrete into a driveway form. PavePro, concrete driveway contractor serving Yazoo City, MS.
Concrete truck pumping into a residential driveway form. PavePro, concrete driveway contractor serving Yazoo City, MS.

Pumped into the forms

Forms are set to the lines and slope of the driveway before the truck arrives, so the concrete goes exactly where it was planned to go.

Concrete driveways
Crew spreading concrete over driveway mesh. PavePro, concrete driveway contractor serving Yazoo City, MS.

Reinforced

Steel is set in place over the compacted base before the pour, so the slab holds together as it carries weight over the years.

Concrete services
Finished broom-finish concrete driveway. PavePro, concrete driveway contractor serving Yazoo City, MS.

Broom finish

A clean broom finish gives tires and shoes grip on a wet day, and it is the finish we put on every concrete driveway we pour.

Compare asphalt

How a Yazoo City concrete driveway is poured

Every pour starts underneath. The ground is graded, soft spots are dug out, and a base is compacted so the slab has even support from end to end instead of sitting on a weak spot. Rebar goes in on top of the base before any concrete arrives, held at the right height so it ends up inside the slab, not under it.

Then the concrete is placed, raked into the forms, and finished. Control joints are cut across the slab so that when concrete cracks, as all concrete eventually does, the cracks stay hairline and run along the joints where we put them. The surface gets a clean broom finish for traction.

If an old driveway is in the way, it comes out first, and the quote shows the tear-out as its own line item. Concrete and asphalt are both done by our own crews, so we can price them side by side and you can choose with the numbers in front of you.

Finisher floating a fresh concrete driveway by a garage. PavePro, concrete driveway contractor serving Yazoo City, MS.
Crew raking concrete into a driveway form. PavePro, concrete driveway contractor serving Yazoo City, MS.

Raked in

Concrete is raked into every corner of the forms while it is still workable, so the slab is full thickness at the edges too.

Roads, lots, and driveways
Crew finishing a concrete driveway pour. PavePro, concrete driveway contractor serving Yazoo City, MS.

Smoothed, then broomed

Finishers level and smooth the surface, then pull a broom across it for traction before it sets. Joints are cut to control cracking.

Concrete driveway details
Freshly poured concrete driveway inside the wood forms. PavePro, concrete driveway contractor serving Yazoo City, MS.

In the forms

The wood forms stay in place while the concrete sets, holding the edges straight. They come off once the slab can stand on its own.

Asphalt driveways

Timing a Yazoo City concrete driveway

You can walk on new concrete after 24 hours and drive on it after about 7 days. It reaches full cure at 28 days. We plan the pour with you so you know where to park while it cures, and when you can use the garage again. If you park a work truck or a trailer, tell us, since that sets the thickness the slab is spec'd for.

Quotes start with a visit by appointment at your property. We look at the old driveway, the slope, and the street end, then write the quote from the office, often the same day. It is free and written, with a line item for each service, each with its own scope. There are no prices over the phone.

After approval and the deposit, most jobs are scheduled within 2 to 3 weeks, and urgent work can go sooner. Our own employees set the forms, place the steel, pour, and finish the slab, from the first stake to the last cut joint.

Fresh concrete slab with a smooth finish beside a house. PavePro, concrete driveway contractor serving Yazoo City, MS.

Concrete driveway timeline

  1. Walk on it

    After 24 hours, foot traffic is fine. Keep cars off while the concrete keeps gaining strength.

  2. Drive on it

    After about 7 days, cars can use the driveway, even though the slab is still curing.

  3. Full cure

    At 28 days the concrete reaches full cure, and the slab is at the strength it was built for.

Recent paving work

Questions about Concrete Driveways

Do you pour the part of the driveway at the street?
+

Yes. If the road belongs to the city or county, check with them about how that edge has to be built, and we pour to what they require.

What goes under and inside the slab?
+

A compacted base underneath and rebar inside, set before the pour so the slab holds together.

Why are there lines cut across new concrete?
+

Those are control joints. When concrete cracks, the cracks stay hairline and follow the joints instead of wandering across the slab.

Do you pour concrete driveways in Yazoo City, around Brickyard Hill and The Triangle?
+

Yes. We pour driveways across town and the county, by appointment at your property.

What finish do you use?
+

A clean broom finish, which gives tires and shoes grip.

Should I choose concrete or asphalt?
+

Concrete costs more up front and lasts 30 years or more. Asphalt costs less up front and lasts 20 to 30 years with upkeep. We do both and can quote them side by side.

How soon can you start?
+

Most jobs are scheduled within 2 to 3 weeks of the deposit. Urgent work can go sooner, sometimes within 10 days.

How thick should a concrete driveway be?
+

It depends on how you will use it. We spec the thickness and rebar per job, and heavier vehicles like trucks or RVs get a thicker pour.

Do you remove my old driveway?
+

Yes. We break out the old concrete or asphalt, haul it away, and regrade before we pour the new driveway.

When can I park in my garage again?
+

You can drive on a new concrete driveway in about 7 days. Keep heavy trucks and trailers off it until it fully cures at 28 days.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline