Curving asphalt driveway shaded by oak trees. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Asphalt Driveway Paving in Yazoo City, MS

Free written quotes on asphalt driveways in Yazoo City, MS.

Asphalt driveway paving in Yazoo City

New installs and full re-paves on a compacted base. 20 to 30 years with upkeep.

We pave driveways for homeowners in neighborhoods like Brickyard Hill, Broadway, and Grand Avenue in Yazoo City and across Yazoo County, with crews coming from our Madison and Jackson locations.

typical thickness3 inches laid, 2.5 inches compacted
base materialCompacted crushed limestone
cure timeCars in about 24 hours, heavy trucks in 48 to 72 hours, full structural cure 6 to 12 months

How we do it

What moves the price

Where a Yazoo City asphalt driveway meets the road

The end of a driveway takes more abuse than the rest of it. Every car turns there, the edge of the street is often a different height, and water running along the road wants to cut under the new asphalt. That is where most driveways start to break first, so it is where we spend the most time when we look at yours.

Before we quote, we look at how the driveway ties in: the street edge, the ditch or curb, and any pipe that carries water under the drive. The new asphalt is graded so water leaves the surface and runs to the ditch, not back toward the house or the garage. If the road belongs to the city or county, ask them whether work at the edge needs their approval, and we build the tie-in to match what they require.

The rest of the drive is built the same way every time: a compacted crushed limestone base, then 3 inches of asphalt laid and rolled to 2.5 inches compacted. With sealcoating and crack filling along the way, it lasts 20 to 30 years.

New driveway edge beside a drainage ditch. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.
Long new asphalt driveway leading up to a ranch house. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Graded to drain

A long drive is shaped so water runs off to the sides and away from the house, instead of sitting on the surface and soaking into the base.

Asphalt driveway paving
Wide curving asphalt driveway edged in fresh topsoil. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Wide at the turn

Curves and the mouth of the drive are where wheels turn hardest, so they are paved wide enough to make the turn without running off the edge.

Private roads and lanes
New asphalt driveway between shade trees leading up to a home. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Sealed after it cures

Once it has cured for 6 to 12 months, a new driveway gets its first sealcoat, then two coats every 1 to 2 years to keep it sealed.

Driveway sealcoating

How we build a Yazoo City asphalt driveway

An old driveway that has failed usually comes out first. The broken asphalt is torn out, the ground is graded down, and soft spots are dug out so the new driveway is not sitting on the same problem. Then a crushed limestone base goes down and is compacted tight. The base does most of the work, so we do not rush it.

Next, the paver lays 3 inches of hot asphalt and the roller compacts it to 2.5 inches. The edges are finished with a plate compactor and raked up to the garage, the walk, and the street so each joint is clean. Paving a driveway usually takes 1 to 2 days on an average job.

You can drive on it in about 24 hours. The asphalt keeps curing for 6 to 12 months, so in that time avoid turning your wheels in place while the car is sitting still, which can scuff the surface. Asphalt usually costs less up front than concrete, and we can quote both if you want to compare.

Roller finishing a new driveway along a wooden fence. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.
Old driveway graded down to base before repaving. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Down to base

The old surface comes off and the ground is graded and compacted, so the new limestone base and asphalt start on solid, even footing.

Driveway repair
Crew raking new asphalt up to a garage door. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Raked to the garage

Hand work at the garage door and the walkway keeps the new surface flush where you step out and where you drive in every day.

Roads, lots, and driveways
Plate compactor finishing the edge of a new driveway. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Edges compacted

A plate compactor finishes the edges the roller cannot reach, so the sides of the driveway hold up instead of crumbling away over time.

Driveway paving details

Getting a Yazoo City driveway quoted and scheduled

We need to see a driveway to quote it. We come out by appointment at your property, look at the old surface, the base, the drainage, and the tie-in at the street, and measure. Where the driveway meets a city or county road, we also note what the road's owner may require at the edge. There are no prices over the phone.

The quote is free and written, sent from the office, often the same day. It has a line item for each service, each with its own scope, so tear-out, base work, and paving are each spelled out. If you are weighing a concrete driveway, we can price that too.

Once you approve it and pay the deposit, most driveways are scheduled within 2 to 3 weeks. The crew that shows up works for us, because we never sub out paving. Plan on a first sealcoat after 6 to 12 months, then two coats every 1 to 2 years.

Curving new asphalt driveway through a front yard. PavePro, asphalt driveway paving contractor serving Yazoo City, MS.

Your driveway, step by step

  1. 1

    Site visit

    We look at the base, the drainage, and where the drive meets the road, then measure the whole driveway.

  2. 2

    Written quote

    Each service is its own line item with its own scope, sent from the office, often the same day.

  3. 3

    Paving day

    Old surface out, limestone base compacted, then 3 inches of asphalt laid and rolled to 2.5 inches.

Recent paving work

Questions about Asphalt Driveways

Do you pave the part of the driveway that meets the road?
+

Yes. We build the tie-in at the street so the edges match and water runs to the ditch. If the road belongs to the city or county, check with them about any approval for work at the edge.

How thick is a new asphalt driveway?
+

We lay 3 inches of asphalt and compact it to 2.5 inches, on a compacted crushed limestone base.

Do you pave driveways in Yazoo City, around Brickyard Hill and The Triangle?
+

Yes. We pave driveways across town and the county, by appointment at your property.

What happens to my old driveway?
+

If it has failed, it is torn out and the ground is graded and compacted before the new base goes down. The quote shows that as its own line item.

Why should I avoid turning my wheels in place on new asphalt?
+

New asphalt cures for 6 to 12 months. Turning the wheels while the car is sitting still can scuff the surface during that time.

Can you give me a price over the phone?
+

No. We come see the driveway, then send a free written quote from the office, often the same day.

How soon can you start on my driveway?
+

Most driveways are scheduled within 2 to 3 weeks of the deposit. Urgent repairs can go sooner, sometimes within 10 days.

How long does the paving process take?
+

For most driveways, paving takes about 1 to 2 days. Weather and driveway size can affect that, but we keep you updated every step of the way.

How long will my asphalt driveway last?
+

With proper care, you are looking at 20 to 30 years of use. Sealcoating every 1 to 2 years and repairing cracks as they appear makes all the difference.

Is asphalt a better choice than concrete?
+

Asphalt is usually more affordable, faster to install, and easier to repair. Concrete lasts longer but costs a lot more up front.

Read all FAQs

Get a free quote

Tell us about the job and we'll send a written quote with a line item for each service.

Phones and quote requests open 24/7. After hours we take your message and call you back the next business morning.
1. You
2. Work
3. Property
4. Timeline
Who is the quote for?
Where's the property?
When do you want this done?
SUMMARY → property · services · timeline
Call Now Get a Free Quote