Free road & municipal paving quotes, anywhere in central and south Mississippi.
Streets and roads paved to the owner's spec and phased around traffic.
We pave to the plans and specifications set by the owner or engineer. Where there is no spec, we recommend a scope for the traffic.
We split the work into sections so streets, entrances, and bus routes stay usable as much as the job allows.
PavePro crews do the paving. We never sub it out, so the people on your road answer to us.
Crosswalks, arrows, and other markings go down with our own employees, with no second contractor to schedule.
| pavement section | Per the owner's or engineer's specs, or spec'd per job |
|---|---|
| open to traffic | Light vehicles in about 24 hours, heavy trucks 48 to 72 hours |
| full cure | 6 to 12 months |
Each kind of road owner runs a project differently, and we plan around that.
Whatever the owner, the road gets the same crew, the same care at joints and tie-ins, and a written, itemized quote.
On a public street, the owner or the owner's engineer decides what goes in the road: the pavement section, the mix, and how the work is checked. Our job is to build to that spec and show that we did. We start by reading the plans, then walk the road to look for anything the plans may not show, such as soft spots, damaged inlets, or driveways that will need careful tie-ins.
HOA projects are often less formal but have more stakeholders. The board may not have an engineer, so we look at the streets, explain what we see, and recommend a scope sized to the traffic. Then we put it in writing so the board can take it to residents.
Either way, scope, phasing, hours, and responsibility for traffic control and permits are agreed in writing before the first truck shows up.
Most roads cannot close completely. We break the job into pieces that keep the network moving: one street at a time, one lane at a time on wider roads, or one entrance at a time where a neighborhood has more than one way in.
Fresh asphalt needs about 24 hours before light traffic and 48 to 72 hours before heavy trucks, so the phasing plan has to account for that as well as the paving day itself. Residents and businesses do better when they know the plan ahead of time: which day their street is closed, where to park, and when they can drive out again.
Rain changes the schedule, since asphalt cannot go down on a wet surface. We tell you as early as we can when weather moves a phase.
Which fix a road needs depends on how deep the damage goes.
If the surface is cracked and worn but the base is sound, a new layer of asphalt can go on top. Our resurfacing and overlays page covers that work. Where curbs, gutters, and inlets have to stay at the same height, the old surface gets milled off first so the new pavement does not bury the curb or block the drains.
If the road shows alligator cracking, ruts in the wheel paths, or soft spots that pump water, the base has failed. Paving over that only buys a short time. Those sections need the base dug out and rebuilt, or the whole road reclaimed. We show you where each condition is so you can decide where the money goes.
Road projects are priced from the scope, so the same street can cost very different amounts depending on what it needs. The main factors:
Agree up front on how base repairs found once work starts will be priced, so a soft spot uncovered mid-job does not turn into an argument.
A clear request gets you a clear quote. Before you reach out, gather what you can:
Send what you have through our quote request and we will come look at the road.
Real job photos from PavePro crews. No stock photos.
Road & Municipal Paving
Paver and dump truck paving a street lane beside a pavilion
Road & Municipal Paving
Crew paving a curving apartment street
Road & Municipal Paving
New asphalt road curving past apartment buildings
Road & Municipal Paving
Crew paving a road edge with the paver and dump truck
Road & Municipal Paving
Roller finishing a new road lane with the crew ahead
Concrete Driveways
New concrete driveway curing in front of a garage
Yes. If the owner or engineer has plans and specs, we price and build to them. If not, we look at the road and recommend a scope sized to its traffic.
Often in part. We phase the work by section or by lane where the road allows it, and we agree on that plan with you before work starts.
Yes. HOA streets are private, so the board sets the scope and the schedule. We give the board a written, itemized quote and plan the work around residents getting in and out.
That depends on who owns the road and how the job is set up. We settle it in writing before work starts so nothing is left to assumption.
Light vehicles in about 24 hours and heavy trucks in 48 to 72 hours. The asphalt keeps curing for 6 to 12 months after that.
Yes. Our own employees handle crosswalks, arrows, and other pavement markings, so the road does not wait on a separate striping company.
Tell us about the job and we'll send a written, itemized quote. No pressure, no runaround.